Antminer S21 XP Imm 380 TH/s
Income a day
$10.69 before power
Choose it for the most income: $10.69 a day before power, $1.72 more.
The Antminer S21 XP Imm 380 TH/s earns $1.72 a day more before power ($10.69 against $8.97).
Income a day
$10.69 before power
Choose it for the most income: $10.69 a day before power, $1.72 more.
Income a day
$8.97 before power
Choose it for a smaller circuit: it draws 4,785 W.
The figures that separate these machines most. The better value carries a tick.
Income a day
Hashrate
Power draw
Weight
Income leads. Power cost and what is left after power follow, at the power price you pick.
|
|
|
|
|---|---|---|
| At $0.074/kWh (10–49 machines) | ||
| Mines | Bitcoin | Bitcoin |
| Income a day | $10.69 (Better) | $8.97 (Better) |
| Power a day | −$10.12 (Better) | −$8.50 (Better) |
| After power a day | +$0.56 (Better) | +$0.47 (Better) |
| After power a month | +$17.11 (Better) | +$14.36 (Better) |
| Profitable up to | $0.078 (Better) | $0.078 (Better) |
Every figure both makers publish, grouped. A row shows only when each machine has the figure.
|
|
|
|
|---|---|---|
| Performance | ||
| Hashrate | 380 TH/s ± 3% Better | 319 TH/s ± 3% |
| Efficiency | 15 J/TH | 15 J/TH |
| Algorithm | SHA-256 | SHA-256 |
| Released | Jun 2024 | Feb 2025 |
| Power and electrical | ||
| Power draw | 5,700 W ± 5% | 4,785 W ± 5% Better |
| Input voltage | 380–415 V | 380–415 V |
| Phase | Three phase | Three phase |
| Frequency | 50-60 Hz | 50-60 Hz |
| Input current | 12 A | 12 A |
| Power connector | P33-P33 cord (included); PSU APW11I1216-1a | LP20 cord (not included); PSU APW111721c |
| Cooling and noise | ||
| Cooling | Immersion | Hydro |
| Coolant | immersion oil | antifreeze (pH 7.0-9.0), pure water (pH 6.5-7.5) or deionized water (pH 8.5-9.5) |
| Inlet temperature | 20–50 °C | 20–50 °C |
| Size and weight | ||
| Dimensions | 364 × 236 × 293 mm | 339 × 173 × 207 mm |
| Net weight | 16.8 kg | 14.5 kg |
| Gross weight | 18.5 kg | 16.4 kg |
| Connectivity | ||
| Network | RJ45 Ethernet 10/100M | RJ45 Ethernet 10/100M |
| Warranty | ||
| Maker warranty | 365 days | 365 days |
What each one costs to buy and to host with us, whether it ships now, and what comes in the box.
|
|
|
|
|---|---|---|
| Availability | Coming soon | In stock |
| Hosting a monthAt $0.078/kWh plus $8 a device for 1 machine | $333 | $280 |
At $0.074/kWh.
Choose two to four miners, then compare income, power and every spec side by side.
Bitmain
$8.97 a day
Bitmain
$6.19 a day
The Antminer S21+ Hyd 319 TH/s earns $2.78 a day more before power ($8.97 against $6.19).
Bitmain
$8.97 a day
Fluminer
$2.95 a day
The Antminer S21+ Hyd 319 TH/s earns $6.02 a day more before power ($8.97 against $2.95).
The Antminer S21 XP Imm 380 TH/s earns more: $10.69 a day before power against $8.97 for the Antminer S21+ Hyd 319 TH/s, $1.72 a day more per machine at today’s network difficulty and coin price.
The Antminer S21 XP Imm 380 TH/s hashes 380 TH/s on 5,700 W (15.0 J/TH). The Antminer S21+ Hyd 319 TH/s hashes 319 TH/s on 4,785 W (15.0 J/TH). The Antminer S21 XP Imm 380 TH/s is immersion and the Antminer S21+ Hyd 319 TH/s is hydro, so each needs its own setup.
Yes. At our hosting rate the Antminer S21 XP Imm 380 TH/s costs about $333 a month to run and the Antminer S21+ Hyd 319 TH/s about $280, any standing fee included.