Mining infrastructure

Containers, hydro racks, immersion tanks, dry coolers, transformers and switchgear to build or extend a site. The written quote includes delivery and the lead time.

Listed
71
Systems
10
In stock
32
An Antspace MD5 container, an Antrack hydro rack and a pad-mounted transformer.

Every system, step by step

A site is built in the same order every time. Each step shows the equipment for it.

  1. Step 1

    Bring in the power

    A transformer steps the grid down to your equipment’s voltage; switchgear splits it into protected feeds.

  2. Step 2

    Choose the cooling

    Air with cooled racks, hydro with racks and a dry cooler, or immersion with tanks and fluid.

  3. Step 3

    House the miners

    A container arrives with racks, power distribution and cooling fitted, ready for a pad and a feed.

  4. Step 4

    Watch it run

    Sensors report temperature, power and faults, so a problem is fixed before it costs a day of mining.

  • In stock

    Bitmain

    ANTSPACE HD5

    Miner slots
    308
    Capacity
    1,512 kW
    Maximum power
    1,665 kW

    $153,600

    Fits 11 models

    View specs
  • In stock

    Bitmain

    ANTRACK AR21

    Miner slots
    4
    Heat rejection
    24 kW
    Rated power (W)
    450

    $3,465

    Fits 6 models

    View specs
  • In stock

    Bitmain

    ANTMINER DCRACK

    Capacity
    36 kW
    Rack units
    47
    PUE
    1.17

    $24,000

    View specs
  • In stock

    ASIC silencer box with LCD screen

    Noise (dB)
    40-50 (from 90)
    Largest miner it fits (mm)
    300 × 200 × 90
    Product dimensions (mm)
    750 × 360 × 360

    $116

    View specs
  • In stock

    Fog Hashing

    Fog Hashing B100

    Miner slots
    20
    Heat rejection
    100 kW
    Maximum power
    110 kW

    $13,340

    Fits 3 models

    View specs
  • In stock

    Engineered Fluids

    BitCool BC-888

    Phase type
    single-phase
    Flash point (°C)
    201
    Dielectric strength (kV)
    >40

    $270

    View specs
  • In stock

    Bitmain

    ANT COLD STORAGE (ACS)

    Heat rejection
    100 kW
    Rated power (kW)
    40
    Maximum power
    80 kW

    $81,600

    View specs
  • ERMCO

    ERMCO three-phase pad-mounted distribution transformer

    Rating, maximum (kVA)
    3,000
    Rating, minimum (kVA)
    30
    Fluid
    oil

    Price on request

    View specs
  • Eaton

    Eaton Magnum DS low-voltage switchgear

    Short-circuit rating, maximum (kA)
    200
    Continuous current, maximum (A)
    10,000
    Voltage class, maximum (V)
    600

    Price on request

    View specs
  • In stock

    Schneider Electric

    APC NetBotz 250A Rack Mount Security and Environmental Appliance (NBRK0250A)

    Compatible sensors
    15

    $624

    View specs
  • In stock

    Bitmain

    ANTSPACE HW5

    Miner slots
    210
    Capacity
    1,200 kW
    Maximum power
    1,200 kW

    $100,800

    Fits 12 models

    View specs
  • In stock

    Bitmain

    ANTRACK AR22

    Miner slots
    4
    Heat rejection
    24 kW
    Rated power (W)
    450

    $10,665

    Fits 6 models

    View specs

Mining infrastructure

Ask us something else
  • What equipment does a mining site need?

    A power feed with a transformer and switchgear, a way to move the heat out (fans for air, a dry cooler for hydro or immersion), somewhere to house the machines (a container or a building with racks), a network line and monitoring. Each system on this page links to the equipment we list for it.

  • Air, hydro or immersion: which should I choose?

    Air is the simplest and suits most standard miners. Hydro runs water-cooled machines at higher hashrate per unit and lets you reuse the heat. Immersion removes fan noise and dust, and suits sites near homes. The choice follows the miners you plan to run and your climate.

  • Can you size the system for my miners?

    Yes. Send the models, how many of each, the power you have and the site location. A person replies with a matched system, the freight and the lead time in writing.

  • What takes longest to arrive?

    Usually the transformer, so it is quoted and ordered first. Containers, racks and coolers follow. We give each lead time in writing with the price.

  • Can you install the site and run it for us?

    Yes. Our turnkey service designs, supplies, installs and commissions the containers, cooling and power, and can run the site day to day.

  • Is hosting a better fit than building a site?

    For a few machines, usually. Hosting with us starts at $0.074 per kWh for 10–49 machines, with no site to build and your own pool account and wallet. Building pays off when you have your own cheap power and enough machines to fill a container.

Planning a site?

Send the machines, the power you have and the site location. A person replies with a matched system, delivery and lead time in writing.