Bitmain
ANTSPACE HD5
- Miner slots
- 308
- Capacity
- 1,512 kW
- Maximum power
- 1,665 kW
$153,600
Fits 11 models
Containers, hydro racks, immersion tanks, dry coolers, transformers and switchgear to build or extend a site. The written quote includes delivery and the lead time.
A site is built in the same order every time. Each step shows the equipment for it.
A transformer steps the grid down to your equipment’s voltage; switchgear splits it into protected feeds.
Air with cooled racks, hydro with racks and a dry cooler, or immersion with tanks and fluid.
A container arrives with racks, power distribution and cooling fitted, ready for a pad and a feed.
Sensors report temperature, power and faults, so a problem is fixed before it costs a day of mining.
Bitmain
$153,600
Fits 11 models
Bitmain
$3,465
Fits 6 models
Bitmain
$24,000
$116
Fog Hashing
$13,340
Fits 3 models
Engineered Fluids
$270
Bitmain
$81,600
ERMCO
Price on request
Eaton
Price on request
Schneider Electric
$624
Bitmain
$100,800
Fits 12 models
Bitmain
$10,665
Fits 6 models
Building your own site is one route. We also host machines in our Texas facility, and build and operate whole sites.
A power feed with a transformer and switchgear, a way to move the heat out (fans for air, a dry cooler for hydro or immersion), somewhere to house the machines (a container or a building with racks), a network line and monitoring. Each system on this page links to the equipment we list for it.
Air is the simplest and suits most standard miners. Hydro runs water-cooled machines at higher hashrate per unit and lets you reuse the heat. Immersion removes fan noise and dust, and suits sites near homes. The choice follows the miners you plan to run and your climate.
Yes. Send the models, how many of each, the power you have and the site location. A person replies with a matched system, the freight and the lead time in writing.
Usually the transformer, so it is quoted and ordered first. Containers, racks and coolers follow. We give each lead time in writing with the price.
Yes. Our turnkey service designs, supplies, installs and commissions the containers, cooling and power, and can run the site day to day.
For a few machines, usually. Hosting with us starts at $0.074 per kWh for 10–49 machines, with no site to build and your own pool account and wallet. Building pays off when you have your own cheap power and enough machines to fill a container.
Send the machines, the power you have and the site location. A person replies with a matched system, delivery and lead time in writing.