Bitcoin · SHA-256

Next Bitcoin halving

Every 210,000 blocks the new-coin reward per block halves. Here is how long until the next one.

Right now · Blocks left

72,574blocks

Until block 1,050,000

days503

hours19

Estimated dateApr 11, 2028

This halving cycle65.4%
Average block time
9 min 12 s
Target 10 min
Reward after
1.5625 BTC
Now 3.125 BTC per block

Block time, which moves the date

Hover or tap the line to read a day.

Low 8.43 min · High 12.97 min

What changed

  • 72,574 blocks to go, about 504 days: around Apr 11, 2028.

  • The reward goes from 3.125 to 1.5625 BTC per block.

  • With price and difficulty unchanged, hashprice would move about 49.7%, from $28.15 to $14.17; in the past both have moved too.

  • At $0.074 power, machines of 8.0 J/TH or better would pay, against 15.9 J/TH today: efficient machines are ready for it.

Bitcoin halving schedule: dates and block rewards

  1. Cycle 1 from block 0 50 BTC Jan 3, 2009
  2. Cycle 2 from block 210,000 25 BTC Nov 28, 2012
  3. Cycle 3 from block 420,000 12.5 BTC Jul 9, 2016
  4. Cycle 4 from block 630,000 6.25 BTC May 11, 2020
  5. Now from block 840,000 3.125 BTC Apr 20, 2024
  6. Next from block 1,050,000 1.5625 BTC Around Apr 11, 2028
  7. Cycle 7 from block 1,260,000 0.78125 BTC Around 2032

Miners that pay today

Earns most In stock
Bitmain Hydro

Antminer S23 Hyd 3U 1,160 TH/s

$32.66 income per day

Hashrate, Power
1,160 TH/s11,020 W
Price
$25,739
In stock
Bitdeer Hydro

SEALMINER A4 Ultra Hydro 886 TH/s

$24.94 income per day

Hashrate, Power
886 TH/s8,373 W
Price
$19,800
In stock
Bitmain Hydro

Antminer S23e Hyd 2U 865 TH/s

$24.35 income per day

Hashrate, Power
865 TH/s8,650 W
Price
$9,360
In stock
Bitmain Hydro

Antminer S23 XP Hyd 600 TH/s

$16.89 income per day

Hashrate, Power
600 TH/s5,340 W
Price
$18,360
In stock
Bitmain Hydro

Antminer S23 Hyd 580 TH/s

$16.33 income per day

Hashrate, Power
580 TH/s5,510 W
Price
$12,143
In stock
Canaan Immersion

Avalon A1566I 270 TH/s

$7.60 income per day

Hashrate, Power
270 TH/s4,500 W
Price
$1,665
In stock
Bitaxe Air-cooled

Naja Duo 1201 4.4 TH/s

3.15 BTC block prize

Chance 1 in 4,200 a year

Hashrate, Power
4.4 TH/s42 W
Price
$443
In stock
Lucky Miner Air-cooled

LV07 1,000 GH/s

3.15 BTC block prize

Chance 1 in 18,000 a year

Hashrate, Power
1,000 GH/s25 W
Price
$116
At $0.074/kWh (10–49 machines)
How we calculate

Earnings use today’s network difficulty and coin price, a 0.0% pool fee and 100% uptime. Power is the price shown, all day. Hardware cost, pool luck and taxes are not included. Hosting under 10 machines adds a standing fee per miner. Not financial advice.

Host your miners at our US facility

From $0.074 per kWh at 10–49 machines, power only. Your pool, your wallet.

A Bitmain Antspace MD5 container with its dry cooler.

Questions miners ask

When is the next Bitcoin halving?

At block 1,050,000, 72,574 blocks from now, which is around Apr 11, 2028. The date moves a little as block times change.

What happens at the Bitcoin halving?

The new-coin reward per block halves, from 3.125 to 1.5625 BTC. It happens every 210,000 blocks.

When was the last Bitcoin halving?

On Apr 20, 2024. The Bitcoin halvings so far: Nov 28, 2012, Jul 9, 2016, May 11, 2020 and Apr 20, 2024.

How many Bitcoin have been mined so far?

About 20,116,959 BTC at block 977,426, which is 95.8% of the 21,000,000 BTC limit. About 883,041 BTC are left to be mined, over many more halvings.

What is a Bitcoin halving?

A rule in the code: every 210,000 blocks the number of new coins paid for each block is cut in half. It slows the supply of new Bitcoin and is one reason miners look at efficiency years ahead.

Which miners are best for a halving?

The most efficient ones. After the halving a machine mines about half as many coins, so efficient models on low-cost power have the most room and keep the most.