Power contract and energized capacity
The contract and the capacity come with the farm.
Buy a farm that is ready to mine: power contract, energized capacity, containers, transformers and miners, handed over to your team or run by ours.
Where
USA and Europe
Power
Power contracts in place
Documents
Data room after NDA
The contract and the capacity come with the farm.
Built, wired and cooled for the machines inside.
Sized for the site's load.
From us, or your own.
Connectivity, access control and cameras.
Drawings, manuals and time with our team.
No fee to see it. We share it after the NDA and company check.
| Deal type | Buy |
|---|---|
| Price | Set out in your proposal after the NDA |
| Payment | Bank transfer or crypto |
| Ownership | You own the equipment from closing. Power and land terms are set in your contract. |
| After handover | We can keep running it. See build and operate |
A short call about your size, timing and region.
We sign an NDA and run our standard company check: KYC, KYB and sanctions screening.
A written proposal and the site documents: power contract summary, single-line diagram, interconnection letter, photos and equipment list. Site visits are welcome.
Terms in writing, read before you sign.
We energize your capacity or hand the farm over, then run it and report monthly if you want us to.
Your size, region and timing are enough to start.
We reply on working days.
A short call with our sales team.
Our NDA and company check, then your proposal.
A person on our sales team reads every request.
The power contract and energized capacity, containers and cooling, transformers and switchgear, miners if you want them, network and security, and a handover pack.
Yes. Site visits are welcome after the NDA and company check, at a time we agree with you.
The power contract summary, single-line diagram, interconnection letter, photos, equipment list and the operating history where there is one.
If you want us to. We can run the farm day to day under a build-and-operate contract, or train your team and step back.
From the site, its power terms and the equipment in it. The price is in your proposal after the NDA.
It depends on the site and the equipment. The handover date is written into your proposal.