ERMCO
ERMCO three-phase pad-mounted distribution transformer
- Rating, maximum (kVA)
- 3,000
- Rating, minimum (kVA)
- 30
- Fluid
- oil
Price on request
Pad-mounted transformers for mining loads, with kVA rating and voltages as published. Lead times are quoted in writing.
Main specs, the models each one fits, and price or quote.
ERMCO
Price on request
Eaton
Price on request
Eaton
Price on request
Eaton
Price on request
Eaton
Price on request
Eaton
Price on request
GE Vernova
Price on request
Hitachi Energy
Price on request
Howard Industries
Price on request
The jobs this equipment does on a mining site, and what to check for each.
A transformer steps the utility voltage down to the voltage your containers or power distribution take.
The kVA rating covers the miners, cooling and auxiliary load with headroom for growth.
Transformers often have the longest lead time on a site, so they are quoted and ordered early.
Building your own site is one route. We also host machines in our Texas facility, and build and operate whole sites.
One rated for the total load of your miners, cooling and auxiliaries with headroom, at your utility’s primary voltage and your equipment’s secondary voltage. We size it from your site details.
It varies by rating and maker. We quote it in writing with the price.
Your utility and a licensed electrician, under your interconnection agreement. Our turnkey service can manage this for you.
Send the machines, the power you have and the site location. A person replies with a matched system, delivery and lead time in writing.