ERMCO
ERMCO three-phase pad-mounted distribution transformer
- Rating, maximum (kVA)
- 3,000
- Rating, minimum (kVA)
- 30
- Fluid
- oil
Price on request
For mining sites that need a three-phase pad-mounted transformer from 45 to 15,000 kVA, or a small single-phase unit.
Hitachi Energy's pad-mounted distribution transformers are outdoor units that sit on a concrete pad and change utility medium voltage to the voltage a site uses. On a mining site they step the utility feed down to the low voltage that switchgear and miner power distribution need. Hitachi Energy builds step-down and step-up units in 2- and 3-winding designs, filled with mineral oil or ester fluid.
The three-phase line covers 45 to 15,000 kVA, with high-voltage windings from 5 to 46 kV and low-voltage windings from 120 V up to 25 kV. Three-phase units carry UL and FM Global listings. There is also a single-phase line up to 250 kVA, with high voltage up to 34.5 kV (150 kV BIL) and low voltage of 480/240 V and below (30 kV BIL).
Each unit is built to the site, so kVA, voltages and fluid are chosen with your utility and electrical engineer. Send us your utility voltage and planned load and we will help you specify one.
Power, cooling and space to plan before it arrives.
What this kind of equipment does on a mining site.
Equipment for running many machines at once, sized by power and cooling rather than by single units.
Send your power, cooling and miner models, and we confirm the fit before you order.
Delivery to your site is included in the price shown.
Build your own site, buy one ready to mine, or run your fleet on our power.
Need the exact delivery scope or packing list? Ask us before you order
Three-phase units from 45 to 15,000 kVA, and single-phase units up to 250 kVA.
High voltage from 5 to 46 kV and low voltage from 120 V up to 25 kV.
Mineral oil or ester fluid.
The three-phase units carry UL and FM Global listings.
Yes. The price shown includes delivery. We confirm the dispatch date and freight route in writing with your order.
Yes. Ask for a quote with the quantity and your site’s location, and a person replies with price, stock and a dispatch date.
Send us your miner models, power supply and cooling. We check the fit against the specifications on this page before you order.
ERMCO
Price on request
Eaton
Price on request
Eaton
Price on request
Eaton
Price on request
Eaton
Price on request
Eaton
Price on request
A site needs transformers, cooling, a power contract and staff. Hosting with us starts at $0.074 per kWh for 10–49 machines, metered per machine, with your own pool account and wallet.