ERMCO
ERMCO three-phase pad-mounted distribution transformer
- Rating, maximum (kVA)
- 3,000
- Rating, minimum (kVA)
- 30
- Fluid
- oil
Price on request
For mining sites and data centers that want Eaton's Hardened Data Center version of the Envirotran pad-mounted transformer.
The Eaton Envirotran HDC is a three-phase pad-mounted transformer from Eaton's Envirotran line, in a version Eaton names Hardened Data Center. A transformer like this steps medium-voltage utility power down to the low voltage that a site's switchgear, PDUs and miners use. Pad-mounted means it stands outdoors on a concrete pad in a closed cabinet, close to the load.
Our data lists the HDC from 45 kVA up to 12,000 kVA, with a primary voltage from 2,400 V up to 46,000 V. That range covers everything from a small site to a large mining facility. On a mining site you choose the kVA size to match the total load of the miners and the cooling, with headroom for growth.
Ask us for the Eaton data for the configuration you need. The standard three-phase Envirotran is listed separately, with its fluid and overload figures.
Power, cooling and space to plan before it arrives.
What this kind of equipment does on a mining site.
Equipment for running many machines at once, sized by power and cooling rather than by single units.
Send your power, cooling and miner models, and we confirm the fit before you order.
Delivery to your site is included in the price shown.
Build your own site, buy one ready to mine, or run your fleet on our power.
Need the exact delivery scope or packing list? Ask us before you order
From 45 kVA up to 12,000 kVA.
From 2,400 V up to 46,000 V.
Both cover 45 to 12,000 kVA and 2,400 to 46,000 V primary. The HDC is Eaton's Hardened Data Center version. We hold fluid and overload figures only for the standard model.
Yes. The price shown includes delivery. We confirm the dispatch date and freight route in writing with your order.
Yes. Ask for a quote with the quantity and your site’s location, and a person replies with price, stock and a dispatch date.
Send us your miner models, power supply and cooling. We check the fit against the specifications on this page before you order.
ERMCO
Price on request
Eaton
Price on request
Eaton
Price on request
Eaton
Price on request
Eaton
Price on request
GE Vernova
Price on request
A site needs transformers, cooling, a power contract and staff. Hosting with us starts at $0.074 per kWh for 10–49 machines, metered per machine, with your own pool account and wallet.