SHA-256

Hammer BC01 1.5 TH/s vs Digital Shovel BluAx 1.2 TH/s

The Hammer BC01 1.5 TH/s earns $0.01 a day more before power ($0.04 against $0.03).

Hammer Miner

Hammer BC01 1.5 TH/s

$98 In stock

Chance of a block a year

1 in 12,000

A lottery machine: it plays every block for the whole prize, with odds of about 1 in 12,000 a year.

Full details

Key differences

The figures that separate these machines most. The better value carries a tick.

  • Noise

    Hammer BC01 1.5 TH/s
    25 dB Better
    Digital Shovel BluAx 1.2 TH/s
    35 dB
  • Power draw

    Hammer BC01 1.5 TH/s
    23 W
    Digital Shovel BluAx 1.2 TH/s
    18 W Better
  • Hashrate

    Hammer BC01 1.5 TH/s
    1.5 TH/s Better
    Digital Shovel BluAx 1.2 TH/s
    1.2 TH/s
  • Efficiency

    Hammer BC01 1.5 TH/s
    15.3 J/TH
    Digital Shovel BluAx 1.2 TH/s
    15.0 J/TH Better

Chance of a block a year

Power price

Hosted with us, 10–49 machines: $0.074 per kWh

Miners side by side: earnings, then specs
Hammer Miner Hammer BC01 1.5 TH/s Digital Shovel Digital Shovel BluAx 1.2 TH/s
At $0.074/kWh (10–49 machines)
Mines Bitcoin Bitcoin
Chance of a block a year 1 in 12,000 1 in 15,000
Power a day −$0.04 −$0.03
After power a day — —
After power a month — —
Profitable up to — —
At $0.074/kWh (10–49 machines)
How we calculate
  • Income is the miner’s share of today’s block rewards and fees, at today’s coin price. Profit after power takes off the electricity at your price.
  • Pool fee 0% and uptime 100% unless you change them.
  • Hosted with us, a standing fee of $6 to $8 per machine a month applies below 10 machines; from 10 machines you pay for power only.
  • From 50 machines, hosting is quoted to your fleet by our sales team.
  • Before taxes, import duty and pool luck.
  • Prices and difficulty change every day. This is a calculation, not financial advice.
Open in the calculator

Full specifications

Every figure both makers publish, grouped. A row shows only when each machine has the figure.

Full specifications
Hammer Miner Hammer BC01 1.5 TH/s Digital Shovel Digital Shovel BluAx 1.2 TH/s
Performance
Hashrate 1.5 TH/s Better 1.2 TH/s ± 5%
Efficiency 15.33 J/TH 15 J/TH Better
Algorithm SHA-256 SHA-256
Power and electrical
Power draw 23 W 18 W ± 5% Better
Cooling and noise
Cooling Air-cooled Air-cooled
Noise 25 dB Better 35 dB
Operating temperature 0–35 °C 10–35 °C
Connectivity
Network Wi-Fi / Bluetooth Ethernet

Buying and hosting

What each one costs to buy and to host with us, whether it ships now, and what comes in the box.

Buying and hosting
Hammer Miner Hammer BC01 1.5 TH/s Digital Shovel Digital Shovel BluAx 1.2 TH/s
Availability In stock Coming soon
Hosting a monthAt $0.078/kWh plus $8 a device for 1 machine $9 $9
Host this one

Which one to buy

At $0.074/kWh.

  1. Before power, the Hammer BC01 1.5 TH/s earns $0.04 a day and the Digital Shovel BluAx 1.2 TH/s $0.03: $0.01 a day more per machine.
  2. At $0.074 per kWh both earn $0.00 a day; the difference is under one cent.
  3. The Digital Shovel BluAx 1.2 TH/s uses 2.2% less power for the same hashrate (15.0 J/TH against 15.3 J/TH), so it keeps more of its income.
  4. They earn on power up to $0.076 (Hammer BC01 1.5 TH/s) and $0.078 (Digital Shovel BluAx 1.2 TH/s) per kWh.
  5. The Hammer BC01 1.5 TH/s hashes 25% more than the Digital Shovel BluAx 1.2 TH/s. Power draw: 23 W for the Hammer BC01 1.5 TH/s and 18 W for the Digital Shovel BluAx 1.2 TH/s.

Add a third miner

Choose two to four miners, then compare income, power and every spec side by side.

Add a miner

Add a third miner

Questions about these two

What is the difference between the Hammer BC01 1.5 TH/s and the Digital Shovel BluAx 1.2 TH/s?

The Hammer BC01 1.5 TH/s hashes 1.5 TH/s on 23 W (15.3 J/TH). The Digital Shovel BluAx 1.2 TH/s hashes 1.2 TH/s on 18 W (15.0 J/TH).

Is the Hammer BC01 1.5 TH/s or the Digital Shovel BluAx 1.2 TH/s better?

On efficiency the Digital Shovel BluAx 1.2 TH/s is better: 15.0 J/TH against 15.3 J/TH for the Hammer BC01 1.5 TH/s, so it keeps more of its income whatever the network does. Weigh income a day and price beside it.

Can I host the Hammer BC01 1.5 TH/s or the Digital Shovel BluAx 1.2 TH/s with Project Hash?

Yes. At our hosting rate the Hammer BC01 1.5 TH/s costs about $9 a month to run and the Digital Shovel BluAx 1.2 TH/s about $9, any standing fee included.