To your address
Delivery to your door, included in the price.
- Power supply
- 380–415 V, three phase
- Energy
- 268 kWh a day
- Power a month
- $1,485 at $0.182 (US average)
- Size
- 900 × 483 × 130 mm
| A day | A month | A year | |
|---|---|---|---|
| Income | $24.18 | $736 | $8,827 |
| After power | +$4.33 | +$132 | +$1,580 |
| Power | $19.86 | $604 | $7,247 |
Price $9,288 Delivery included In stock
What one machine mined each day, from that day’s network reading.
Past days, rebuilt from each day’s network reading. Not a forecast.
Every coin on the SHA-256 algorithm, with what this machine would earn a day on each, before power.
Bitcoin
BTC
$24.18 a day
0.00040365 BTC mined a day
Bitcoin Cash
BCH
$21.66 a day
0.10974 BCH mined a day
Bitcoin SV
BSV
$23.04 a day
1.64 BSV mined a day
Income before power updated 2 minutes ago How we calculate
For large hydro farms that want dense 19-inch rack servers at 13 J/TH.
The Antminer S21e XP Hyd 3U is a 19-inch rack-mount hydro server that mines Bitcoin at 860 TH/s for 11,180 W, or 13 joules per terahash. Bitmain released it in early 2025.
It packs roughly the output of two standard hydro miners into one 3U chassis. The unit measures 900 x 482.6 x 130 mm and weighs 42.7 kg, so it slides into standard data-centre racks. Input is three-phase 380-415 V at up to 24 A through an LP34 power port. Coolant connects with OD14 fittings and needs 16 to 20 L/min, inlet 20 to 50 C, at up to 3.5 bar.
This model suits large hydro farms and container builds that want dense racks and fewer units to manage per megawatt. It is not a machine for small sites.
11,180 W around the clock, 268.3 kWh a day.
| Supply | Current | Smallest breaker |
|---|---|---|
| 380 V | 17.0 A | 25 A |
| 400 V | 16.1 A | 25 A |
| 415 V | 15.6 A | 20 A |
Sized for a continuous load. An electrician confirms the wiring on site.
Need the exact packing list or a spare cord? Ask us before you order
Delivery is in the price. Run it yourself, or ship it straight to our Texas facility.
Delivery to your door, included in the price.
We rack it and run it on your own pool account.
Pay by Bank transfer Crypto
A standard 19-inch rack with 3U of height and at least 900 mm of depth.
An LP34 power port on three-phase 380-415 V, drawing up to 24 A.
16 to 20 L/min through OD14 connectors, about twice a standard hydro miner.
Yes, at today’s numbers. It earns $24.18 a day before power. At $0.074 per kWh you keep $4.33 a day after power, and it earns on power up to $0.090 per kWh.
Yes, at our container facility in Texas. Hosting is priced by how many machines you host: 1–4 machines $0.078 per kWh plus $8 per machine a month; 5–9 machines $0.076 per kWh plus $6 per machine a month; 10–49 machines $0.074 per kWh, electricity only; 50+ machines by custom quote. For this machine, power at $0.074 per kWh comes to about $603.94 a month.
Yes. At checkout, choose delivery to our Texas facility instead of your address. We receive it, rack it and run it on your own pool account, so the coins go straight to your wallet.
It mines coins on the SHA-256 algorithm: Bitcoin (BTC), Bitcoin Cash (BCH), Bitcoin SV (BSV). Our profit figures on this page use Bitcoin.
Bitmain covers it for 365 days under its own warranty terms. Our warranty page explains how to make a claim.
Same algorithm, nearest efficiency, same power price.
|
|
|
|
|
|
|
|---|---|---|---|---|---|
| Earns per day | $24.18 | $18.56 | $17.94 | $26.15 | $24.32 |
| After power at $0.074/kWh | +$4.33 | +$3.91 | +$2.64 | +$1.29 | +$8.96 |
| Earns on power up to | $0.090 | $0.094 | $0.087 | $0.078 | $0.117 |
| Price | $9,288 | $11,880 | $6,289 | Price on request | $9,360 |
| Hashrate | 860 TH/s | 660 TH/s | 638 TH/s | 930 TH/s | 865 TH/s |
| Power | 11,180 W | 8,250 W | 8,613 W | 14,000 W | 8,650 W |
| Efficiency | 13 J/TH | 12.5 J/TH | 13.5 J/TH | 13.5 J/TH | 10 J/TH |
| Compare | Compare SEALMINER A3 Pro Hydro 660 TH/s | Compare WhatsMiner M7DS 638 TH/s | Compare WhatsMiner M79S 930 TH/s | Compare Antminer S23e Hyd 2U 865 TH/s |
Income before power updated 2 minutes ago How we calculate