New miner setup checklist
Every check from the unopened box to the first hour of hashing. Read them here or print the PDF.
New miner setup checklist
Before power-on
Most first-day trouble is decided before the machine gets power: the circuit, the air and the state of the box.
- Check the box and the unit for transport damage.
- Photograph the serial label and keep the invoice.
- Confirm the circuit matches the voltage and power on the rating label.
- Plan airflow so hot exhaust cannot reach the intake.
- Keep the spot dry and free of dust.
First start
A machine that is found on the network and has a pool and a password of its own is easy to look after from then on.
- Connect the network cable, then the power.
- Find the miner's IP address in your router or the maker's IP tool.
- Change the default dashboard password.
- Enter your pool address, worker name and password.
First hour
The first hour gives you the normal figures. You will need them the day something changes.
- Compare the hashrate with the rated figure.
- Check every board reports and temperatures look even.
- Check every fan spins and none is noisy.
- Note the date, settings and readings in a log.
General guidance. Where your maker's manual or terms differ, follow them.
Questions about this checklist
How long does it take to set up an ASIC miner?
With the circuit and the network cable in place, usually under an hour. The electrical work takes longer and should be done before the machine arrives.
Do I need a computer next to the miner?
No. Any phone or computer on the same network can open its page. After setup the miner works by itself and you watch it on the pool.
What should I write down?
The serial number, the IP address, the firmware version, the power mode, and the hashrate and temperatures after the first hour.