BM-S3+ 25 TH/s
$52.61 income per day
- Hashrate, Power
- 25 TH/s3,400 W
- Price
- $13,950
Every 210,000 blocks the new-coin reward per block halves. Here is how long until the next one.
Right now · Blocks left
66,168blocks
Until block 1,050,000
days459
hours18
Estimated dateMar 1, 2028
Hover or tap the line to read a day.
66,168 blocks to go, about 460 days: around Mar 1, 2028.
The reward goes from 3.125 to 1.5625 BTCB2 per block.
With price and difficulty unchanged, hashprice would move about 49.9%, from $2.10 to $1.05; in the past both have moved too.
At $0.074 power, machines of 0.6 J/TH or better would pay, against 1.2 J/TH today: efficient machines are ready for it.
Earnings use today’s network difficulty and coin price, a 0.0% pool fee and 100% uptime. Power is the price shown, all day. Hardware cost, pool luck and taxes are not included. Hosting under 10 machines adds a standing fee per miner. Not financial advice.
From $0.074 per kWh at 10–49 machines, power only. Your pool, your wallet.
At block 1,050,000, 66,168 blocks from now, which is around Mar 1, 2028. The date moves a little as block times change.
The new-coin reward per block halves, from 3.125 to 1.5625 BTCB2. It happens every 210,000 blocks.
A rule in the code: every 210,000 blocks the number of new coins paid for each block is cut in half. It slows the supply of new Bitcoin BLAKE2b and is one reason miners look at efficiency years ahead.
The most efficient ones. After the halving a machine mines about half as many coins, so efficient models on low-cost power have the most room and keep the most.